The following issues were discussed:
For Action:
1. 7 June 2013: Please complete the table - list of participants. The purpose is to see how we could cover all issues with minimal effort. It is not necessary that everyone test everything. We should have 2-3 vendors per item. Please pay attention that these items are not concrete test procedures, but only areas of the profile.
2. 7 June 2013: Please confirm the scope for the test models for Dynamics and HVDC (see below)
The next call will be on 17 June – see the planning below
1) Issues
Issue No354 is now closed. It is OK like this. CoordinateSystem and Location inherit from IdentifiedObject
2) Test models – the models below are in addition to regular test models SCADA/EMS type, or bus branch type discussed in previous calls
a. Dynamics
i. ENTSO-E 16 (11 July 2011)
1. BE part: ExcAC4A, GovSteam0, GovSteam1, PssIEEE2B,
2. NL part: ExcAC1A, ExcST1A, GovHydro1, GovHydro2, PssIEEE2B,
The IOP will use the following standard models: ExcIEEEAC1A, ExcIEEEAC4A, ExcIEEEST1, GovSteam0, GovSteam1, GovHydro1, GovHydro2, PssIEEE2B. In addition standard model for synchronous machines
Variant Dyn1: all represented as standard models
Variant Dyn2: ExcIEEEST1 represented as proprietary model
b. HVDC
i. ENTSO-E 16
1. Variant DC1: One of the tie-lines should be HVDC CSC
2. Variant DC2: one internal line should be HVDC VSC
3. Variant DC3 (optional): combination of variant 1 and variant 2.
Status planning
ü 27 May: IOP call to discuss issues and TP profile part of the HVDC including Boundary
ü 29 May: Chavdar to summarize all issues for WG13. Some of these issues may be resolved in the WG13 call on 29 May. The rest will be discussed in the WG13 meeting 4-7 June
ü 3 June: Chavdar to produce a new version of the profile which fixes resolved issues during IOP call 27 May and WG13 call on 29 May; we should get stabilized on attributes to be included in the SSH
· 3 June: IOP call to discuss test procedure and profile document; we can discuss small issues as well; freeze the content of the test dynamics models; agree on which model will have HVDC; we need to agree how we exchange information on test models (we need a common place for models and models description)
ü 3 June: Chavdar to send xls table to identify: who is coming; who is testing what (we may need to divide the work so that we have all main areas covered);
· 4-7 June: WG13 meeting to resolve some issues or give directions; should not leave issues after 7 June if we want to test in the IOP
· 10 June: no IOP call
· 10 June: Chavdar produces a profile, if we need update
· 12 June: CIMug meeting – no WG13 call
· 17 June: IOP call – 2h: discussion on status of the test models and issues with validation; see how we test specific issues like project support
· 24 June: IOP call – 1h: freeze test procedures and profile document for the IOP
· 1 July: IOP call – discussion on test models – areas of enhancement/improvement
· 8 July: IOP week
Participants: |
1 |
Olsen, Svein |
2 |
Gubernali, Adriano… |
3 |
Cott, Giatgen |
4 |
Lincoln, Richard |
5 |
Bozukov, Georgi |
6 |
Tomic, Dragan |
7 |
Kravljaca, Gordana… |
8 |
Ford, Michael |
9 |
Nagarkar, Rashmi |
10 |
Falk, Herb |
11 |
Wiernowolski, Mich… |
12 |
Martinovic, Lajos |
13 |
Brown, Pat |
14 |
Osterlund, Lars-Ol… |
15 |
Miller, Martin |
16 |
Britton, Jay |
17 |
Rogowski, Tomasz |
18 |
Milic, Vladimir |
19 |
Lopez, Rafael |